Home Project Planning

Project Planning

The expensive mistakes are made before you order a single machine.

Throughput, footprint and lifetime cost are largely decided in the concept and the tender — long before commissioning. I plan automated warehouses from the data up and write a functional tender that vendors answer on your terms rather than theirs.

Why the concept phase decides it

A design figure is not a throughput figure

Most of the cost of an automated warehouse is committed on paper, in decisions taken before a supplier is even chosen. Once the layout is poured in concrete and the contract is signed, the room to correct a weak assumption is gone — and it is paid for every year of the asset's life.

01

Sized for the demo, not the peak

A layout dimensioned against a clean average, rather than the real order structure and seasonality, hits a wall the first busy week. The shortfall is structural and permanent.

02

A tender written by the vendor

When the specification comes from the supplier, the proposals are comparable only to each other and every quiet assumption favours the seller. A functional tender puts you back in control of the comparison.

03

No independent read on feasibility

Concept, simulation and business case are usually supplied by the party that profits from a yes. Someone who has commissioned these systems can tell you which numbers will survive contact with the floor.

Scope

What the planning phase covers

Concept and design

Data and process analysis

  • Order structure, SKU profile and seasonality analysed from real data
  • Current process mapped and bottlenecks quantified
  • Growth and peak scenarios defined and stress-tested

Material flow and layout

  • Material-flow design and technology selection
  • Facility planning and layout, building included where needed
  • Static calculation and, through my network, dynamic simulation
  • Realistic sustained throughput, not a clean-profile design figure

Tender and vendor selection

Tender documents

  • Functional tender documents written around your requirement
  • Vendor-specific tender documents where a shortlist is set
  • A specification vendors answer on your terms, not theirs

Evaluation

  • Structured evaluation of proposals against defined criteria
  • Technical questions forced into the negotiation before signing
  • CAPEX and OPEX compared on a like-for-like basis
  • Clean handover of the awarded scope to project management
How it works

From data to a signed contract

Scoped to the decision in front of you — a concept study, a tender or the full path from analysis to award.

  1. Data and requirements

    Order and article data, growth assumptions and constraints gathered and turned into a quantified brief rather than a wish list.

    Step 1
  2. Material flow concept

    Technology options weighed against your own profile, sized for the peak, with the trade-offs made explicit.

    Step 2
  3. Layout and simulation

    Layout developed and, where the risk warrants it, confirmed by dynamic simulation before any money is committed.

    Step 3
  4. Tender and award

    Functional tender issued, proposals evaluated, technical points negotiated and the award handed cleanly to realisation.

    Step 4
Evidence

Planned and designed, then handed over clean

Sales and design · Grocery wholesale · Norway

Deep-freeze SCP installation in Scandinavia

Owned the sales and design process for the system, negotiated the contract and handed the project over to the realisation team.

Technology: Automated shuttle storage, delayering robots, case stacking robots, WCS, pack-pattern generator.

Outcome: Successful sales process and contract negotiation, clean handover to realisation.

Sales and design · Grocery retail · Germany

Multi-area automated warehouse — building included

Owned the sales and design process for the whole facility including the building itself, negotiated the contract and handed over to the realisation team.

Technology: Building, automated high-bay warehouse, shuttle system, pallet conveyor, multi-zone picking, AGVs, WCS.

Outcome: Successful sales process and contract negotiation, clean handover to realisation.

Project Planning

Planning a new system or a major extension?

The earlier the read, the more room there is to change the answer. A short first conversation costs nothing.